Rejuvenation with Workload Migration
01 January 2010
AbstractA five-state model of software rejuvenation is introduced that divides the working state into three sub-states: working, vulnerable, and preparing. The preparing state models the period during which workload is drained from software elements that are about to be rejuvenated. We compared our model to a four-state model that only has working and vulnerable sub-states.