This paper considers optimal sequencing of inspections in a model with precedence constraints.
We consider the server scheduling problem in hybrid P2P networks in the context of a fluid model.
The multi-user multiple-input-multiple-output (MIMO) space- time scheduling problem is the prime focus of the paper.
We study the continuous frequency spectrum management problem for the two-user Gaussian interference channel. We consider a successive interference cancellation scheme between the two receivers.
Adaptive algorithms for blindly identifying single-input multiple-output (SIMO) systems are appealing because of their computational efficiency and capability of continuously tracking a time-varyin
We consider the nonpreemptive scheduling of n>=1 stochastic jobs so as to minimize the expected number of parallel machines needed to meet given waiting-time constraints.
A class of optimal stopping problems for the Wiener process is studied herein, and asymptotic expansions for the optimal stopping boundaries are derived.
The faithful recovery of the base sequence in automatic DeoxyriboNucleic Acid (DNA) sequencing fundamentally depends on the underlying statistics of the DNA electrophoresis time series, Current DNA
Consider a pair of Brownian motions B sub s sup (1) on the interval [0,1] with absorption at the endpoints. The joint state space is the square E = [0,1]x[0,1].
Optimal Test Point Selection for Sequential Manufacturing Processes By M. R.